BJ ENERGY INTL Holds Talks with Jiangxi Electric Power Construction
Time:2025-07-14

On July 14, Zhu Jun, President of Beijing Energy International, met in Yangxi, Guangdong, with Zou Shengping, Party Secretary and Chairman of PowerChina Jiangxi Electric Power Construction Co., Ltd. The two sides held discussions regarding the construction of the Yangjiang-Yangxi natural gas CCHP project. 




During the meeting, both parties presented their respective business developments and future plans. They conducted a focused and in-depth discussion on key aspects of the Yangxi project, including safe and standardized construction, engineering progress, and commissioning timelines. Both sides acknowledged that the two companies have built a solid foundation of cooperation through past projects. This meeting further strengthened their shared commitment to collaboration and to integrating resources from both parties to ensure the Yangxi project is commissioned on schedule. Looking ahead, the two parties aim to expand cooperation opportunities, fully leveraging their respective strengths in resources, talent, and technology. They will work together to achieve a higher level of mutual benefit and win-win outcomes, contributing jointly to the national transition toward green and low-carbon energy development.

Participants from Jiangxi Electric Power Construction included Kuang Xiaolong, Board Secretary, Director of the General Office, and Director of Strategic Development; Cheng Lingxing, President Assistant and Director of the EPC Management Center; Jiang Xiaoping, Deputy Chief Engineer and Director of the Quality Management Department; Zhang Yan, Director of the Party Organization Department and Mass Work Department; and Chen Liangjun, General Manager of the Commissioning Division. Also in attendance were Gong Kaifeng, Deputy General Manager and Chief Engineer of Shanghai Commissioning Institute; Zhou Manyi, Deputy General Manager of Northwest Supervision Company; Su Zhou, Executive Director of Beijing Energy International (Yangxi) Integrated Energy Company, Chairman of Gujing Energy, and Deputy Director of the Jilin-to-Beijing Power Transmission Project Preparatory Office; Peng Jin, President of Gujing Energy; and Wang Yaokun, General Manager of Beijing Energy International (Yangxi) Integrated Energy Company.