• 14
    06,2024
    On June 14, Zhang Ping, Chairman of the Board of Beijing Energy International, met with Shao Danwei, Chairman of Wanbang Digital Energy Co., Ltd., in Shanghai. The two parties held in-depth discussions on promoting cooperation in the field of new energy.  During the meeting, both parties introduced their respective business layouts a...
  • 14
    06,2024
    Recently, the State Administration for Market Regulation and the National Standardization Administration of China announced the National Standard Announcement of the People’s Republic of China (No. 9 of 2024). The national standard GB/T 44079-2024 “Operation Procedures for Tower Solar Thermal Power Plants,” co-compiled by Beiji...
  • 13
    06,2024
    On June 12, Zhang Ping, Chairman of the Board of Beijing Energy International, visited Shanghai and held discussions with Yang Yougui, Senior Vice President and President of Global Marketing Service System for Huawei Digital Power, and Frank Phuan, Asia-Pacific President of EDPR (EDP Renewables), regarding deepening cooper...
  • 13
    06,2024
    On June 13, Zhang Ping, Chairman of the Board of Beijing Energy International, held talks in Shanghai with He Qixin, Chairman of SUNREV, and Zou Shengping, Chairman of PowerChina Jiangxi Electric Power Construction Co., Ltd., regarding deepening cooperation in the field of new energy. During the meeting, the three parties intro...
  • 13
    06,2024
    On June 13, Zhang Ping, Chairman of the Board of Beijing Energy International, led a delegation to Shanghai to meet with Zhang Xiaoyi, Executive Deputy Director of the Bond Business Center of the Shanghai Stock Exchange (SSE). Both parties conducted discussions on deepening cooperation in the financial sector. During the meeting, th...
  • 13
    06,2024
    On June 13, Zhang Ping, Chairman of the Board of Beijing Energy International, led a team to participate in the 17th International Photovoltaic Power Generation and Smart Energy Conference & Exhibition (Shanghai). During the event, Zhang Ping and his team visited the exhibition booths of various participating enterprises, gainin...
  • 11
    06,2024
    On June 7, the 220 kV booster station of the Dalin Area in the 1.38 million kW ecological governance wind power base project in Horqin District, Tongliao City successfully achieved power backfeeding in one attempt. At 23:36 on June 8, as the blades of the first wind turbine at Beijing Energy International’s Dalin Xilin Wind Farm began to ...
  • 07
    06,2024
    On June 7, Zhang Ping, Chairman of the Board of Beijing Energy International, met with Li Zhongjun, Vice President of Dongfang Electric Corporation (DEC) in Beijing. The two parties engaged in discussions regarding in-depth cooperation in the field of new energy. During the meeting, both parties introduced their respective company backg...
  • 30
    05,2024
    On May 30, Zhang Ping, Chairman of the Board of Beijing Energy International, met with Chairman Li Feng and President Wang Jianpeng of SERMATEC in Shanghai. The two sides exchanged on deepening cooperation in the field of new energy. Before the meeting, Zhang Ping and his entourage toured SERMATEC’s showroom at their head...
  • 30
    05,2024
    On May 29, Zhang Ping, Chairman of the Board of Beijing Energy International, met with Dong Liang, Party Secretary and Chairman of Jiangsu Guoxin Investment Group(JSGX) in Nanjing, Jiangsu Province. The two sides exchanged on cooperation in the field of new energy.  During the meeting, both parties introduced their respective ...