• 28
    07,2026
    On July 27, Wu Chaoke, Vice President of Beijing Energy International, met in Beijing with Du Yi, Vice President of CMB Financial Leasing Co., Ltd., and his delegation. The two sides held discussions on deepening cooperation in the new energy sector.  During the meeting, both parties presented overviews of their respective busines...
  • 28
    07,2026
    On July 27, Beijing Energy International’s 2.64 MW distributed photovoltaic (PV) project at BAIC Technician Institute (BATI) in Beijing E-Town successfully completed the record-filing process, marking another major milestone in the company’s strategic deployment of green campus projects and providing solid clean energy support for the...
  • 24
    07,2026
    On July 24, Zhang Ping, Executive Director and President of Beijing Energy International, met in Beijing with Tian Yue, President of the China Joint Venture of Saudi Electricity Company (SEC), and his delegation. The two sides held discussions on deepening cooperation in the new energy sector.  During the meeting, both parties p...
  • 24
    07,2026
    On July 24, Zhang Ping, Executive Director and President of Beijing Energy International, and Zhu Jun, Executive President, met in Beijing with Wei Desheng, President of China Construction Second Engineering Bureau Co., Ltd. (CSCEC Second Bureau), and his entourage. The two sides held discussions on deepening cooperation in t...
  • 24
    07,2026
    On July 24, Zhang Ping, Executive Director and President of Beijing Energy International, and Zhu Jun, Executive President, met in Beijing with Yu Haimiao, Deputy Secretary of the Party Committee and President of SDIC Power, and his entourage. The two sides held discussions on deepening cooperation in the new energy sector. Durin...
  • 23
    07,2026
    On July 23, Beijing Energy International held its 2026 Mid-Year Strategy Seminar and Work Conference in Beijing. The meeting was attended by Zhang Ping, Executive Director and President; Liu Guoxi, Secretary of the Party Committee and Chairman of the Labor Union; Zhu Jun, Executive President; Vice Presidents Huang Hui, ...
  • 21
    07,2026
    On July 21, Wu Chaoke, Vice President of Beijing Energy International, met in Beijing with Tang Junwu, President of Guangdong Electric Power Development Co., Ltd., and his delegation. The two sides held talks on deepening cooperation in the field of clean energy.  During the meeting, both sides presented their business and industria...
  • 15
    07,2026
    On July 15, Wu Chaoke, Vice President of Beijing Energy International, met in Beijing with Jiang Wu, Party Secretary and Chairman of China Construction Third Bureau First Engineering Co., Ltd. (“CCTB First Engineering Company”), and his delegation. The two sides held talks on deepening cooperation in the energy sector.  ...
  • 09
    07,2026
    On July 6, Beijing Energy International’s Beijing E-Town Hualian Printing 1.14 MW Distributed Photovoltaic Project successfully completed project filing, marking a significant milestone in the development of the park’s green energy project.  Located at the Beijing Hualian Printing facility at No. 3 Donghuan North Road in Beijin...
  • 07
    07,2026
    On July 7, Zhang Ping, Executive Director and President of Beijing Energy International, met with Zhou Shichang, President of Hongde Group, and his entourage in Beijing. The two sides held discussions on cooperation in the fields of new energy, energy storage, and electricity trading.  During the meeting, the two sides exchanged overvi...